Using a Covermeter to correct GPR wave velocity during Concrete Scanning

By August 16, 2018 4 Comments

If you use GPR and didn’t know how this worked, then you should get further training. Check out our upcoming webinars, classes, and live workshops at LearnGPR.com.

******* SUBSCRIBE TO THE CHANNEL*******

Subscribe to our channel: http://www.youtube.com/learngpr

******* WHAT IS LEARNGPR*******

LearnGPR.com is an online training platform for Ground Penetrating Radar that helps civil engineers, utility locators, and others learn about GPR through fun and engaging courses and coaching.

******* FREE TRAINING FROM LEARNGPR*******

Go to http://learngpr.com to sign up for our free Introductory Training Video on Ground Penetrating Radar (GPR).

******* CONNECT WITH LEARNGPR*******

Want to learn more about GPR? Follow us at:
http://facebook.com/learngpr
http://youtube.com/learngpr
http://twitter.com/learngpr (tag your GPR questions with #learngpr)
http://instagram.com/learngpr (tag us on your pics to get featured)
http://linkedin.com/company/learngpr
http://medium.com/@learngpr

Join the discussion 4 Comments

  • Terry Odgers says:

    Hi Dan … The cover meter calibration is novel approach. I’m curious though; I have always picked the maximum peak of the first “bright” reflection as the top of the rebar. You used the Hilbert transform to create an “envelope”, from which you picked the max of the Hilbert transform data. The max of the Hilbert transform corresponds to the maximum peak of the 2nd “bright” reflection. Which method is correct (first peak maximum or 2nd peak maximum)? And what sort of % difference in depth estimate does it cause?

    • dpbigman says:

      Both are technically correct. The envelope doesn’t correspond with the second band always. It just is the part of the signal with the largest response and doesn’t distinguish between positive and negative polarity. Picking the top of the first band is fine as long as you picked the top of the first band for the ground reflection too. If you choose the second band for your rebar depth, then your ground reflection must be zeroed to your second band. If you choose the peak of the envelope as your rebar depth then you better choose the peak of the envelope for the ground reflection zero. Hope this helps!

  • Andreas Kaus says:

    Hi Dan,

    thanks for another great Video! Immensely enjoyed it. I saw that you guys were focusing on the negative amplitudes on the A- and B-Scan to determine the depth of the rebar in the concrete slab. Why not the positive? Has PROCEQ a reversed coloring scheme or is it about how you set time zero?

    • dpbigman says:

      Hi Andreas,

      Thanks for the question. It’s both. Each system is different and each manufacturer has their own way. You can technically pick any part of the reflection signal as long as it is the same part of the signal that you called your ground zero. For this system they don’t focus on the positive or negative. Only the peak of the envelope.